Consulting services
Independent TEA and LCA that holds up when someone checks it.
Fixed scope and a fixed fee, agreed after a free 30-minute call. You provide the documents, models and pilot data you already have. There’s no new software to learn and no parallel internal study to run.
Services
Most founders start with the review.
Recommended starting point
Independent TEA/LCA Review
Fits when
You already have a model and want it tested. Best when a raise or offtake diligence is live.
You receive
- An assumption register, tagged by source
- A challenge log with a verdict on each priority assumption
- A sensitivity summary with the downside case
- A report you can hand to an investor as it stands
- A findings session with your leadership
Build it independently
Scale-up & TEA Assessment
Fits when
You need the economics built by someone with no stake in the answer. Usually 4 to 6 weeks.
You receive
- Capex and opex
- Cost per tonne today, and the trajectory to an Nth-of-a-kind plant
- Sensitivity analysis
- A benchmark against competing pathways
- A report and the live model
For buyers and registries
LCA & Carbon Integrity Assessment
Fits when
You need carbon numbers a buyer or registry will accept. Usually 4 to 6 weeks.
You receive
- An ISO 14040/44 life-cycle assessment
- Carbon intensity per tonne removed or per unit of product
- Documentation aligned with registry requirements
Where a review leaves a question unresolved, the report says so plainly, and you decide whether it needs answering and by whom. The review is an independent technical opinion. It is not ISO 14064 validation or registry verification.
What you get first
Every assumption that decides the case, on one page.
The assumption register is where every review starts. Each assumption is tagged by where it came from, ranked by how far it moves your headline cost, and given a verdict once it has been tested.
| Assumption | Source | Effect on headline cost | Verdict |
|---|---|---|---|
| Pilot yield at commercial scale | Measured, pilot | High | Test further |
| Sorbent lifetime | Supplier data | High | Revise |
| Plant utilisation | Engineering judgement | Medium | Revise |
| Electricity price | Literature | Medium | Holds |
| Plant lifetime | Literature | Low | Holds |
IllustrativeA made-up example of the format, not taken from a client project. A real register usually runs to dozens of rows, and only the top few decide the case.
How a project runs
From your design basis to a decision that holds, in 5 steps.
Scope
We agree what the evidence has to support, and who will scrutinise it. Then we fix the boundary, feedstock, site and maturity assumptions. An NDA is signed before any data changes hands.
Where you end upOne agreed description of the system and the decision.
Surface
Every assumption that carries weight goes into one register, tagged as measured, supplier data, literature or engineering judgement, and ranked by how far it moves your headline numbers.
Where you end upYou know which handful of numbers decide the case.
Scrutinise
The priority assumptions are tested against published evidence, comparable technologies and my own modelling, including what your pilot data can and cannot support at scale.
Where you end upThe hard questions asked before an investor or buyer asks them.
Synthesise
Engineering, economic and environmental evidence are put on the same basis. Scenarios then move several assumptions at once, because that’s how diligence treats them.
Where you end upEconomics that survive an imperfect year, and carbon claims anyone can inspect.
Support
The findings are written for the decision you named at the start: what’s defensible now, what remains uncertain, and what has to happen before the next commitment.
Where you end upOne independently challenged evidence base for investors, buyers and your board.
What I look at
The 3E Framework: engineering, economics and environmental integrity, together.
Each can be right on its own and the case can still fall apart where they meet.
ENGINEERING
What the pilot proves
What your pilot proves about a plant at commercial scale, and what is still extrapolation.
ECONOMICS
What the plant costs and earns
Capex, opex and revenue under realistic changes in energy price, yield, utilisation and scale, including the downside case.
ENVIRONMENTAL INTEGRITY
What each tonne removes
Whether your TEA, LCA and MRV use the same boundaries, and what the life-cycle numbers say about net removal rather than gross capture.
Gross is not net.
Carbon Engineering’s published direct air capture design delivers 1.46 MtCO2/yr. Only 0.98 MtCO2/yr of it comes from the air. The rest is from natural gas burned on site. Count all of it as removal and the claim is nearly 50% too high, before any life-cycle emissions are subtracted.
Keith et al., Joule, 2018. The 0.48 is the difference between the 2 published figures.
Questions founders ask
Before you book.
We already have a TEA and LCA.
Good. The review starts from them. The question isn’t whether the work is competent. It’s whether anyone without a stake in the answer has challenged the assumptions underneath it.
We don’t have enough data yet.
That’s when a review helps most. It separates what has to be measured now, what can be bounded, and what doesn’t matter for the next decision.
Our investors haven’t asked for this.
Investors form a view of your numbers from the first deck. Finding a weak assumption before diligence means you fix it on your timetable rather than theirs.
Will you tell us if the case doesn’t hold?
Yes. The findings say what’s defensible now and what isn’t. Sometimes the answer is that the case isn’t ready yet, and the report says what would have to change.
What if you find nothing wrong?
Then you go into diligence with an independent record that the assumptions were examined and hold up.
Talk through your case.
A free 30-minute call to work out whether a review fits and what it would cover. Fees are fixed and agreed before any work starts.
The newsletter
The questions your investors will ask, answered first.
The GreenTech Business Case is for founders, CEOs and CTOs with a raise, an offtake agreement or a scale-up decision ahead. It has 14,700+ subscribers on LinkedIn.
The GreenTech Business Case
Each edition takes a single question a funder, buyer or board will put to you, and works through what a defensible answer looks like. Free, by email.
